Construction Cost Overruns & Financing Risk: What Borrowers Need to Know

ā€œMost construction projects don’t fail because of the deal.
They fail because the budget was wrong.ā€

If you’re building, renovating, or developing real estate, construction cost overruns are one of the biggest financial risks you face—and lenders know it.

From a financing perspective, cost overruns aren’t just an inconvenience.
They can break your loan, kill your returns, and force you to bring more cash to the table.

Let’s break down how lenders view this risk—and how smart borrowers structure around it.


Why Construction Cost Overruns Are So Dangerous

In today’s environment—especially in markets like Houston—construction costs are volatile:

Ā·Labor shortages

Ā·Material price swings

Ā·Permit delays

Ā·Change orders mid-project

Even a 5–10% cost overrun can completely change your deal structure.

Here’s why:

šŸ‘‰ Your loan is based on a fixed budget (LTC)
šŸ‘‰ Your valuation is based on projected NOI
šŸ‘‰ Your exit depends on hitting those numbers

If costs go up but rents don’t?
Your entire capital stack gets squeezed.


How Lenders Underwrite Construction Risk

Lenders aren’t guessing—they’re underwriting downside.

Here’s what they focus on:

1. Loan-to-Cost (LTC)

Most construction loans sit around:

Ā·60%–70% LTC

That means:

Ā·You’re already bringing 30%–40% equity

Ā·Any overrun? That’s on you

šŸ‘‰ Key Insight:
Cost overruns don’t get financed—they get funded by the borrower.


2. Contingency Reserves

Most lenders require:

Ā·5%–10% contingency built into the budget

But here’s the reality:

āž”ļø That buffer disappears quickly with:

Ā·Change orders

Ā·Site issues

Ā·Delays

If your contingency is thin, lenders see risk immediately.


3. Interest Reserves

Many construction loans include:

Ā·3–12 months of interest reserves

But if your project is delayed:

Ā·Reserves burn faster

Ā·You may need to inject additional capital


4. Exit Risk (The Real Problem)

This is where most borrowers get it wrong.

If costs increase:

Ā·Your basis goes up

Ā·Your DSCR goes down

Ā·Your refinance options shrink

šŸ‘‰ Lenders are asking:
ā€œCan this deal refinance at today’s rates?ā€

If the answer is no—your deal is at risk before it even starts.


Real-World Example

Let’s break it down:

Ā·Original project cost: $2,000,000

Ā·Loan at 65% LTC: $1,300,000

Ā·Equity: $700,000

Now add a 10% overrun ($200,000):

Ā·New cost: $2,200,000

Ā·Loan stays the same

Ā·New equity required: $900,000

šŸ‘‰ That’s a 28% increase in equity required

And most borrowers aren’t prepared for that.


How Smart Borrowers Protect Themselves

This is where strategy separates amateurs from professionals.

1. Underwrite with Conservative Costs

Ā·Inflate labor/material estimates slightly

Ā·Assume delays

Ā·Build real contingencies

šŸ‘‰ Don’t underwrite to ā€œmake the deal workā€


2. Structure Liquidity Upfront

Lenders want to see:

Ā·Post-closing liquidity

Ā·Reserves available

šŸ‘‰ Liquidity = flexibility when things go wrong


3. Lock in Pricing Where Possible

Ā·Fixed-price contracts

Ā·Guaranteed maximum price (GMP) agreements

šŸ‘‰ This transfers risk away from you


4. Focus on Exit From Day One

Ask:

Ā·What does DSCR look like at stabilization?

Ā·What happens if rates stay higher?

Ā·Can I refinance this loan safely?

šŸ‘‰ Structure beats rate—every time


5. Work with a Mortgage Broker

Most borrowers go to one bank.

Professionals:

Ā·Shop multiple lenders

Ā·Structure interest reserves

Ā·Negotiate contingency requirements

Ā·Align financing with the business plan

šŸ‘‰ That’s where deals get saved—or lost.


Final Takeaway

Construction cost overruns aren’t a ā€œwhat if.ā€
They’re a when.

The real question is:

Did you structure your financing to survive it?

If you’re building, renovating, or developing—strategy matters more than ever.


šŸ“ž Call to Action

If you're buying, refinancing, or structuring a commercial deal in the next 12 months:

Let’s build the deal the right way — before it ever hits underwriting.

Bill Rapp
Medallion Funds

🌐
https://billrapponline.com/


https://www.billrapponline.com/

https://findamortgagebroker.com/Profile/WilliamRappJr28883

https://billrapp.commloan.com/

https://billrapponline.com/financingfuturescre-houston-katy

https://houstoncommercialmortgage.com/

https://author.billrapponline.com

https://doctorvideo.billrapponline.com/

https://veteransvideo.billrapponline.com/

https://mortgageviking.billrapponline.com/

https://fha203h.billrapponline.com/

https://renovationvideo.billrapponline.com

https://medallionfunds.com/bill-rapp/

https://www.amazon.com/dp/B0F32Z5BH2

https://veed.cello.so/FOmzTty6oi9

https://buymeacoffee.com/vikingente3

https://creplaybookseries.billrapponline.com

https://creplaybook.billrapponline.com/


Ā© 2023-2024 Bill Rapp, Medallion Funds LLC, Director of Capital Advisory


Bill Rapp - Commercial & Residential Mortgage Broker

Bill Rapp - Commercial & Residential Mortgage Broker

Whether you're a first-time homebuyer, a seasoned investor, or a business owner with ambitious plans, securing the right financing is crucial. At Medallion Funds, we take the guesswork out of mortgages, offering a comprehensive suite of residential and commercial loan options to fit your unique needs. Looking for Your Dream Home? We understand the excitement and challenges of navigating the residential real estate market. Our experienced mortgage brokers will guide you through every step, from pre-qualification to closing. We offer a variety of loan programs to suit your financial situation, including: • Fixed-rate mortgages: Offering stability with predictable monthly payments. • Adjustable-rate mortgages (ARMs): Providing competitive rates for a set period. • FHA loans: Making homeownership accessible with lower down payments. • VA loans: Rewarding veterans with attractive rates and flexible terms. Investing in Your Business Future? Growth often requires capital, and we can help you unlock the potential of your commercial property. Our brokers specialize in a wide range of commercial loan options, including: • Purchase loans: Financing the acquisition of new buildings or land. • Construction loans: Facilitating the development of your project. • Refinance loans: Restructuring your existing mortgage for better terms. • SBA loans: Providing access to government-backed financing for qualified businesses. The Medallion Funds Difference: We go beyond simply finding a loan. We take the time to understand your goals and develop a personalized strategy. Here's what sets us apart: • Expertise: Our brokers have a deep understanding of both residential and commercial lending. • Competitive Rates: We leverage our strong lender relationships to secure the best possible terms. • Streamlined Process: We handle the paperwork, keeping you informed every step of the way. • Exceptional Service: We're committed to providing you with a positive and stress-free experience. Ready to Take the First Step? Contact Medallion Funds today for a free consultation. Let's discuss your financing needs and help you achieve your dreams!

LinkedIn logo icon
Instagram logo icon
Youtube logo icon
Back to Blog